Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Learner driver sits test 110 times

Tue, 13 Aug 2013

A 28-year-old woman has sat her driving theory test 110 times, costing the unnamed candidate a whopping £3,410 in test fees. It’s unknown whether the candidate actually passed her driving theory test at the 110th attempt. Reported by the Daily Mirror, the figures released under a Freedom of Information Act request to the Driver and Vehicle Licencing Agency (DVLA) stand as a new record for failing the first section of the UK’s two-part driving test.

New Blower Bentley being planned?

Sat, 16 May 2009

Are Bentley working on a modern version of the legendary Blower Bentley? [ad#ad-1] The original Blower Bentley wasn’t actually the creation of W.O. Bentley.

Seat completes industry's largest solar panel installation

Mon, 25 Nov 2013

SEAT HAS completed construction of the largest solar panel installation in the automotive industry. The huge 'Seat al Sol' array at the firm’s Martorell plant outside Barcelona is the size of 40 football pitches and generates 15 million kilowatt hours of power per year courtesy of the reliable Spanish sunshine. The electricity produced is enough to account for a quarter of the amount needed to build a year’s allocation of Leons, reducing the factory’s energy bills significantly and saving 7,000 tonnes of CO2 per year.